Translations:PAVEsense/137/en: Difference between revisions
From ASAsense Documentation (staging)
en translation |
m FuzzyBot moved page Translations:PaveSense/137/en to Translations:PAVEsense/137/en without leaving a redirect: Part of translatable page "PaveSense" |
||
(No difference)
| |||
Latest revision as of 12:02, 14 October 2026
- Type and Value:
- Damage: choose the kind of damage from the list – rutting, longitudinal, transverse or alligator cracking, ravelling, potholes, subsidence, segregation, bleeding, edge damage, corner breaks, joint damage, faulting, scaling, polishing, heaving, missing, sunken or damaged elements, joint fouling, weed growth, flooding, contamination or Other;
- Obstruction: free description, for example a road narrowing or work zone;
- Repair: choose the intervention – overlay, milling and overlay, local repair, joint filling, surface sealing, slurry seal, crack injection, reprofiling, thin asphalt layer, surface treatment, concrete repair, element repair, base-layer replacement or Other;
- Speed limit: the speed limit in km/h;
- Surface: the surface type (Asphalt, Concrete, Brick, Cobblestone or Other). As long as this annotation is in effect, this surface type takes precedence over the automatic estimate. See Current surface type and monthly report.
- Date (from): the date from which the annotation applies (yyyy-mm-dd, or pick a date with the calendar);
- Valid until (optional, for annotations from the detail page or the map): the end date. Leave the field empty for an annotation without an end date; after the end date the annotation moves to the history;
- Reason (optional, for bulk annotations from the table): a short explanation, for example "road works";
- Temporary change (for bulk annotations from the table): tick this for a temporary change (for example road works), so the group can easily be undone in one go later.